Cost
$825,000
Completion
Summer 2013
Indiana State University – Chilled Water Extension results in low disruption
R.E. Dimond and Associates extended the campus chilled water system piping to Sycamore Towers including all design work to connect to the existing 24” chilled water piping to the nearby street. These pipes are directly buried under the sidewalks resulting in minimal disruption to the newly paved 5th Street. The shallow bury will reduce the impact of excavation significantly and also reduced installation cost.