Construction Cost: $3,500,000
Size: 9,000 SF
Construction Completed: Summer 2014
Building Project Summary:
R.E. Dimond and Associates redesigned the Shelbyville High school Natatorium to have a 6 lane 25 yard stretch pool for today’s competitive use. The construction includes a 42′ extension of the west wall of the pool area, and expansion of the pool to an 8 lane 115′ long tank. The north wall of the pool area was moved into the existing locker room area to create space for spectator seating. A pool equipment room was newly constructed and is located on the north side, toward the west end of the pool. All work is within the existing pool area, locker room, existing pool equipment room and site, west and south of the addition.