Building Project Summary:
Replacement of the existing 100 ton and 40 ton air-cooled packaged chillers required chilled water cooling coils to be added to the two existing AHU’s currently serving the gym.
Mechanical design included the replacement of the chiller, remote evaporators and modifying piping . The new chiller is the most efficient unit that will fit within the existing mechanical service yard.
Chilled water piping was extending to the two gym mechanical rooms. Chilled water cooling coils were added to the two existing AHU’s to provide cooling to the Gym.