Construction Cost:
$1,200,000
Construction Completed:
April, 2014
Building Project Summary:
R.E. Dimond and Associates designed mechanical and electrical plans and specifications for the kitchen renovation at John Marshall Middle School (JMMS) located at 10108 East 38th.
Design included new lighting, new ceilings, new refrigeration systems for the walk-in freezer and walk-in refrigerator, new underfloor plumbing systems and new electrical distribution for new kitchen equipment, new fire suppression system (with new building water service) for remodeled kitchen and cafeteria, and revised HVAC system and hood exhaust in kitchen. In addition, a temporary serving kitchen was designed to allow construction to proceed while the school was occupied.