Category:
Higher Education
Cost
$1,746,000
Size
52,000 SF
Completion
Summer 2015
Indiana University Southeast Hillside Hall HVAC upgrade
R.E. Dimond and Associates was selected to design HVAC upgrades for Hillside Hall which included removal of electric resistance heat and installation of high efficiency hot water heating boilers complete with pumps, distribution piping expansion tank, air separator, fill etc. Additionally, R.E. Dimond provided design for replacement of electric heat with hot water heating coils, dual duct mixing boxes with VAV boxes, conversion of hot deck ducts to cold deck ducts, and utilization of both ducts for cooling.