Construction Cost: $6,000,000
Size: 6,350 SF
Construction Completed: Spring 2009
Design Team:
Halstead Architects, R.E. Dimond & Associates, MEP Engineer
Building Project Summary:
This renovation included the addition of an elevator. Engineering services provided included HVAC and plumbing design, lighting, power and data design and fire suppression and life safety system design.
This project consisted of: 6,350 square foot school expansion; 4,000 square foot gathering space; and 1,050 square foot outdoor storage facility. In addition, improvements were made to the existing church basement/cafeteria and existing school corridors were renovated.