Arsenal Technical High School

Category: K-12

Construction Cost: $34,000,000

Size: 400,000 SF

Construction Completed: 2013

Building Project Summary:

Twelve buildings on the historic 85 acre campus are included in this renovation. The project was complicated and involved four different bid packages. These bid packages, including their scheduling, allowed project design and construction to be completed in clusters so as to minimize disturbance to students on the campus. The design and construction phase were completed over a four year process.

As the lead design firm, R.E. Dimond provided designs of complete mechanical, electrical, plumbing and technology in addition to coordinating civil, structural, architectural, site utilities and scheduling.

❮ Previous Project
Next Project ❯

Our Location

Located in the heart of Indianapolis, R.E. Dimond is an Indianapolis MEP engineering consulting firm.

We are easily accessible from major interstates around Indiana and offer large conference rooms suitable for hosting project meetings and free parking.

START A PROJECT

Contact Bill Eisler, Executive Vice President, Mechanical Services – bill.eisler@redimond.com

732 N Capitol Avenue Indianapolis, IN 46204 Phone: 317.634.4672

Connect

Subscribe to Email

Copyright © 2021 All Rights Reserved

Site by Crafted