Category:
Higher Education
Construction Cost:
$270,000
Size:
59,000 SF
Construction Completed:
2010
Building Project Summary:
Provided fire protection system design including main and branch pipe routing and proposed sprinkler head locations. All sprinkler monitoring components were connected to the existing fire alarm system.